Tennessee Department of Transportation road work
Madison County, U.S. Highway 45 Bypass and Interstate 40
Saturday – Interchange improvements on U.S. Highway 45 Bypass north and southbound from the I-40 ramps to Old Hickory Boulevard for paving and construction of retaining walls. Widening of I-40 from just east of Exit 79 to just east of Exit 82.
Time – 6 a.m. to 6 p.m. – close left lane of I-40 east and west bound between exit 79 and Exit 82 for portable barrier work.
Back up date – Sunday, March 10, 6 a.m. to 6 p.m.
Monday, March 11 through Friday, March 15, 7 a.m. to 5 p.m.
Intermittent lane closures on Carriage House Drive, west bound, right lane only. One lane to remain open at all times.
Looking Ahead –
Saturday, March 16, 6 a.m. to 6 p.m.
Intermittent lane closures on I-40 for pothole repair work for the length of the project, east and west bound. One lane to remain open at all times.
Back up date, Sunday, March 17, 6 a.m. to 6 p.m.
(PHOTO: U.S. Highway 45 Bypass at Interstate 40 – courtesy Wes Harris, State Farm)
David Thomas, Twitter – @DavidThomasWNWS
https://www.facebook.com/NewsTalk1015/
