From the Tennessee Department of Transportation –
Madison County – I-40 – The grading, drainage and paving with Portland Cement Concrete on I-40 (Exit 93) at the SR-152 (Law Road) interchange (LM 25.85–LM 26.86)
Continuing through Wednesday, December 20 – There are no scheduled lane closures.
Madison County US-70 (SR-1) – The resurfacing on US 70 (SR 1) from near Mobile Street to Whitehall Street will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.
Madison County US-412 (SR-20) – The resurfacing on US 412 (SR 20) (North Parkway) from near I-40 to US 70 (SR 1), including bridge expansion joint repair and thin epoxy overlay will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.