From the Tennessee Department of Transportation –
Madison County – I-40 – The grading, drainage, and paving with Portland Cement Concrete on I-40 (Exit 93) at the SR 152 (Law Road) interchange.
Continuing through Wednesday November 22: There are no scheduled closures.
Madison County – I-40 – The grading, drainage, construction of bridges, retaining walls and noise walls, ITS and paving on I 40 from west of US 412 (SR 20, Hollywood Drive) to west of the US Highway 45 Bypass (SR 186).
Continuing through Tuesday, November 21, 7 p.m. – 6 a.m. – I-40 east and westbound will have intermittent lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for pavement markings, permanent signs, and texture coating.
LOOK AHEAD –
Monday, November 27 through Wednesday, November 29, 7 p.m. – 6 a.m. – I-40 east and westbound will have intermittent lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for pavement markings, and permanent signs.
Madison County US-70 (SR-1) – The resurfacing on US 70 (SR 1) from near Mobile Street to Whitehall Street will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.
Madison County US-412 (SR-20) – The resurfacing on US 412 (SR 20) (Parkway Ave.) from near I-40 to US 70 (SR 1), including bridge expansion joint repair and thin epoxy overlay will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.