From the Tennessee Department of Transportation –
Madison County – 1-40 – The grading, drainage, construction of bridges, retaining walls and noise walls, ITS and paving on I 40 from west of US 412 (SR 20, Hollywood Drive) to west of the US 45 Bypass (SR 186).
Continuing through Wednesday, October 25, 7 p.m. – 6 a.m. – I-40 east and westbound will have intermittent lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for bridge deck grinding and grooving, pavement markings, and texture coating.
LOOK AHEAD:
Wednesday, October 25 through Wednesday, November 1, 7 p.m. – 6 a.m. – I-40 east and westbound will have intermittent lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for bridge deck grinding and grooving, pavement markings, and texture coating.
Madison County – I-40 – The grading, drainage and paving with Portland Cement Concrete on I 40 (Exit 93) at the SR 152 (Law Road) interchange.
LOOK AHEAD:
Friday, October 27 through Sunday, October 29, 7 p.m. – 6 a.m. – I-40 east and westbound from MM 89.0 to MM 91.0 will have intermittent left lane closures for construction activities. All lanes will open by 6 a.m.
Madison County US-70 (SR-1) The resurfacing on US 70 (SR 1) from near Mobile Street to Whitehall Street will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.
Madison County US-412 (SR-20) The resurfacing on US 412 (SR 20) (Parkway Ave.) from near I-40 to US 70 (SR 1), including bridge expansion joint repair and thin epoxy overlay will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.