YOU'RE LISTENING TO

Mike & Gina In The Morning

6:00 AM - 8:00 AM

YOU'RE LISTENING TO

Mike & Gina In The Morning

6:00 AM - 8:00 AM

Road work schedule – Jackson-Madison County

From the Tennessee Department of Transportation –

Madison County – I-40 – The grading, drainage and paving with Portland Cement Concrete on I-40 (Exit 93) at the SR 152 (Law Road) interchange. Continuing through Wednesday, June 28 – There are no scheduled closures.

Madison County – I-40 – The grading, drainage, construction of bridges, retaining walls and noise walls, ITS and paving on I 40 from west of US 412 (SR 20, Hollywood Drive) to west of the US 45 Bypass (SR 186).

Monday, June 26 and Tuesday, June 27, 7 p.m. – 6 a.m. – I-40 eastbound will have right lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for beam installation on the SR20 bridge.

Monday, June 26 and Tuesday, June 27, 7 p.m. – 6 a.m. – SR 20 (US-412/Hollywood) will have intermittent lane closures and the use of crossovers going east and westbound from north of the Exit 79 interchange to south of the Exit 79 interchange for beam installation on the SR 20 bridge.

Restrictions: Beginning July 20, 2022: There is an 11’ width restriction east and westbound on I-40 from MM 76.9 to MM 79.6.3 with no shoulder. Speed limit is reduced to 55 MPH, through the work zone, from MM 76.9 to MM 79.9.

LOOK AHEAD

Madison County – Wednesday, June 28, 9 p.m. – 6 a.m. – There will be a temporary lane closure on SR 186 Northbound over I-40 for bridge repair joint work. The first phase will require a couple hours closure to Exit 80B on I-40 eastbound.

Wednesday, June 28 and Thursday, June 29, 7 p.m. – 6 a.m. – I-40 eastbound will have right lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for beam installation on the SR 20 bridge.

Wednesday, June 28 through Friday, June 30, 7 p.m. – 6 a.m. – SR-20 (US-412/Hollywood) will have intermittent lane closures and the use of crossovers going east and westbound from north of the Exit 79 interchange to south of the Exit 79 interchange for beam installation on the SR20 bridge.

Friday, June 30, 7 p.m. – 12 a.m. – I-40 eastbound will have right lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for beam installation on the SR20 bridge.

Friday, June 30, 7 p.m. – 12 a.m. – SR-20 (US-412/Hollywood) will have intermittent lane closures and the use of crossovers going east and westbound from north of the Exit 79 interchange to south of the Exit 79 interchange for beam installation on the SR20 bridge.

Madison County SR-20 – The resurfacing on US 412 (SR 20) from the Crockett County line to near Ramp 7-A (Country Club Lane), including concrete repair on bridges will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.

Madison County SR-43 – The improvement of the intersection on U.S. 45 (S.R. 43) at Green Valley Farms will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.

Share On

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
Monday-Friday
Saturday-Sunday

Deal Of the Day

Brought To You By

Brought To You ByGet Deal

Stock Market Brought To You By Talk N West TN

Crypto Brought To You By Mann's Wrecker

    Bitcoin