YOU'RE LISTENING TO

The Dan Reaves Show

3:00 PM - 6:00 PM

YOU'RE LISTENING TO

The Dan Reaves Show

3:00 PM - 6:00 PM

Road work schedule – Jackson-Madison County

From the Tennessee Department of Transportation –

MADISON COUNTY – I-40 – The grading, drainage and paving with Portland Cement Concrete on I 40 (Exit 93) at the SR 152 (Law Road) interchange.

Thursday, May 25, Tuesday, May 30 and Tuesday, May 31, 7 p.m. – 6 a.m. – There will be flaggers present intermittently on the eastbound “On” ramp at Exit 93 as well as flaggers present on Law Road near the ramp going both directions. Motorists should watch for crews and equipment in the roadways.

LOOK AHEAD:

Wednesday, May 31 through June 7, 7 p.m. – 6 a.m. – There will be flaggers present intermittently on the eastbound “On” ramp at Exit 93 as well as flaggers present on Law Road near the ramp going both directions. Motorists should watch for crews and equipment in the roadways.

MADISON COUNTY – I-40: The grading, drainage, construction of bridges, retaining walls and noise walls, ITS and paving on I 40 from west of US 412 (SR 20, Hollywood Drive) to west of the US 45 Bypass (SR 186).

I-40 traffic both east and westbound will be shifted to the newly constructed inside lanes.

Additionally, the eastbound “Off” ramp at Exit 79 as well as the ramp from US-412 to westbound I-40 will be closed during this phase of construction. Detours will be posted.

Continuing through Wednesday, May 31 – There are no scheduled closures.

LOOK AHEAD:

Wednesday, May 31 through Wednesday, June 7 – There are no scheduled closures.

MADISON COUNTY SR-20: The resurfacing (either microsurface or thin mix overlay) on US 412 (SR 20) from the Crockett County line (LM 0.00) to near Ramp 7-A (Country Club Lane) (LM 6.50), including concrete repair on bridges will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.

MADISON COUNTY SR-43: The improvement of the intersection on U.S. 45 (S.R. 43) at Green Valley Farms will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.

MADISON COUNTY SR-223: Grading, drainage and paving on a S. I. A. route supporting Hwy 223 East side (SR-223 & Fiberglass Road) may cause temporary lane closures. Motorists should watch for crews and equipment in the roadways.

Share On

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
Monday-Friday
Saturday-Sunday

Deal Of the Day

Stock Market Brought To You By Talk N West TN

Crypto Brought To You By Mann's Wrecker

    Bitcoin