From the Tennessee Department of Transportation –
MADISON COUNTY – I-40 – The grading, drainage, construction of bridges, retaining walls and noise walls, ITS and paving on I 40 from west of US 412 (SR 20, Hollywood Drive) to west of the US 45 Bypass (SR 186).
I-40 east and westbound
Friday, May 19, 7 p.m. through Monday, May 22, 6 a.m. – There will be intermittent lane closures on I 40 east and westbound from east of MM 76.0 (Exit 76) to east of MM 80.0 for demolition of the I 40 east and westbound bridges over SR 20 (US 412/Hollywood).
Friday, May 19, 7 p.m. through Monday, May 22, 6 a.m. – SR 20 (US 412/Hollywood) will have intermittent lane closures and the use of crossovers going east and westbound from north of the Exit 79 interchange to south of the Exit 79 interchange for demolition of the I 40 east and westbound bridges over SR 20 (US 412/Hollywood). Weather permitting.
Beginning Mid-May 2023: I 40 traffic both east and westbound will be shifted to the newly constructed inside lanes. Additionally, the eastbound “off” ramp at Exit 79 as well as the ramp from US 412 to westbound I 40 will be closed during this phase of construction. Detours will be posted.
LOOK AHEAD:
Wednesday, May 24 and Thursday, May 25, 7 p.m. – 6 a.m. – (AS NEEDED) I 40 east and westbound will have intermittent lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for equipment mobilization and Phase II widening work.
Tuesday, May 30 and Wednesday, May 31, 7 p.m. – 6 a.m. – (AS NEEDED) I 40 east and westbound will have intermittent lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for equipment mobilization and Phase II widening work.
MADISON COUNTY – I-40 – The grading, drainage and paving with Portland Cement Concrete on I 40 (Exit 93) at the SR 152 (Law Road) interchange.
Wednesday, May 17 through Wednesday, May 24, 6 a.m. – 6 p.m. – There will be flaggers present intermittently on the eastbound “On” ramp at Exit 93 as well as flaggers present on Law Road near the ramp going both directions. Motorists should watch for crews and equipment in the roadways.
LOOK AHEAD: Thursday, May 25, Tuesday, May 30 and Tuesday, May 31, 6 a.m. – 6 p.m. – There will be flaggers present intermittently on the eastbound “On” ramp at Exit 93 as well as flaggers present on Law Road near the ramp going both directions. Motorists should watch for crews and equipment in the roadways.
MADISON COUNTY SR-20: The resurfacing (either microsurface or thin mix overlay) on US 412 (SR 20) from the Crockett County line (LM 0.00) to near Ramp 7-A (Country Club Lane) (LM 6.50), including concrete repair on bridges will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.