Road work schedule for West Tennessee counties

From the Tennessee Department of Transportation

 

There will be possible DAYTIME or NIGHTTIME lane closures at various locations in Region
4 to make repairs or new installs on an as needed basis at various locations throughout the 21
counties.

 

District 47
BENTON, CARROLL, HENRY, GIBSON, OBION, WEAKLEY, DYER COUNTY

 

VARIOUS ROUTES — Pavement markings will be repainted across the Region (West
Tennessee). This will result in a slow-moving work zone on interstate and state routes in Shelby,
Fayette, Haywood, Madison, Henderson, and Dyer counties.

VARIOUS ROUTES — Pavement testing will cause temporary lane closures in District 47.

 

BENTON COUNTY
I-40 at Exit 126 — The grading, drainage, and paving on I-40 at the US-641 (SR-69)
interchange (Exit 126) will cause temporary lane closures throughout the project.

 

BENTON COUNTY
SR-1 (US70) — The grading, drainage, and paving on SR-1 (US 70) from the Camden Bypass to
the Tennessee River will cause temporary lane closures throughout the project. The following
roads are closed for construction. Traffic to utilize Cutt-Off Rd to access US-70 (SR-1):

Missionary Grove Church Rd from US 70 (SR-1) to Old Hwy 70 and Old Hwy 70 from
Missionary Grove Church Rd to US 70 (SR-1).

 

CARROLL COUNTY
SR-22 SR-364 — The Resurfacing on SR-22 from near SR77 to SR77 and SR364 from SR22
to SR77 will cause lane closures throughout the project paving and bridge repair.

 

CARROLL COUNTY
SR-76 (US-79) — The grading, drainage, noise walls, signals, and paving on U.S. 79 (S.R. 76)
from near S.R. 77 to near Cutlip Lane will cause lane closures throughout the project.
Meadowbrook Lane is closed.
Cutlip Lane — Traffic was shifted to the new alignment from near Cutlip Ln. to the Connector
Road leading into Trezevant, speed limit reduced to 35 MPH. Traffic will proceed down the new
alignment to an All-Way Stop, then onto Old US79 (SR76).
Dorsey Rd is closed for utility realignment and road construction, weather permitting. The detour
route is posted.
Clay Farm Rd is closed for utility realignment and road construction, weather permitting. The
detour route along Newsome Rd. is posted.
Power Station Rd — Is closed for road construction, and traffic is detoured along US-
70A/SR105 Main Street.

SR-105 — Traffic is shifted to the new realignment close to Power Station Road.

 

DYER COUNTY
US-51 (SR-3) — The Resurfacing on US-51 (SR-3) from near SR181 to SR-78 will cause lane
closures throughout the project for paving.

 

DYER COUNTY
SR-211 — The bridge over the North Fork Forked Deer River (just south of Dyersburg) will
have outside lane closures for inspection and evaluation.

 

DYER COUNTY
US-412 and US-51 INTERCHANGE — The full-depth repair of the concrete ramp from US-
412 (SR20) to SR-211 North/St. Johns Ave, will cause the ramp to be closed from. A signed
detour will be provided.

 

GIBSON COUNTY
SR-5 — The miscellaneous safety improvements on U.S.45(SR-5) at the intersection of Broad
Street in Dyer will cause lane closures throughout the project.

 

GIBSON COUNTY
SR-43 — The repair of pipes by the City of Milan on US-45E (SR-43/N. 1 st  Street) from the
intersection of US-79 (SR-76) to W. Woodrow Street will result in daily lane closures, one lane
in each direction will be maintained.

 

GIBSON COUNTY
SR-105 — The resurfacing on SR-105 from Shiloh Road to Wayne Lloyd Road will cause lane
closures throughout the project for paving.

 

OBION COUNTY
SR-5 — The resurfacing on US-45W (SR-5) from the Gibson County Line to Polk Station Road
will cause lane closures throughout the project for paving.

 

OBION COUNTY
SR-43 — The resurfacing on US-45E (SR-43) from the Weakley County Line to Kentucky State
Line will cause lane closures throughout the project for paving.

 

HENRY COUNTY
SR-218 — The Resurfacing on SR-218 from the SR-77 to SR-76 will cause lane closures
throughout the project for paving.

 

District 48
CHESTER, CROCKETT, DECATUR, HARDEMAN, HARDIN, HAYWOOD, HENDERSON,
MADISON, MCNAIRY

 

CHESTER COUNTY
SR100 between E. Main St. and Baker Rd.
Crews are replacing 2 bridges on SR100 between E. Main St. and Baker Rd. Please use caution
throughout the area. A temporary traffic signal is in place at the bridge over Dry Creek, east of
Henderson.
Restrictions — Speed limit is reduced from 55 MPH to 45 MPH on SR100
Width — 12’ Width Restriction

 

CHESTER COUNTY
Talley Store Rd. (County Road) is closed between Terry Ln. To past Talley Rd.
Talley Store Rd. closed for a bridge replacement.

 

CROCKETT COUNTY
SR88 in Bells, TN in relation to relocating SR76 around Pictsweet

The following roads closed in Bells, TN
·       Central Ave. (SR88) from High St. To Christian Ave Ext.
·       Central Ave. (SR88), west of the CSX Railroad
·       Weddle St., south of Mitchell Ave.
·       Hicks St., from High St. to south of existing Central Ave. (SR88)
A posted detour will be in place for SR88.

 

HARDIN COUNTY
S.R.69 from near Bingham Creek to the Decatur County line.
The resurfacing work will cause daily lane closures.

 

HARDIN COUNTY
Bridge on SR 128 over the Pickwick Dam
Continuing through Wednesday, August 12 — There will be intermittent lane
closures for the SafeSpan installation. Flagmen will be present during lane closures.

 

HARDIN COUNTY
SR 203 from Burnt Church Road to near Lonesome Pine Road

Resurfacing on SR203, from Burnt Church Rd. to Lonesome Pine Rd., will cause temporary lane
closures. Motorists should watch for equipment entering the highway.

 

HAYWOOD COUNTY
SR180 Near Jeffries Rd. To Raymond Akin Rd. Closed to through traffic
SR180 is closed to through traffic for bridge construction.

 

HAYWOOD COUNTY
SR54 from near Thomas Street to the Crockett County line
Resurfacing on SR54, from Thomas St. to the Crockett County line, will cause temporary lane
closures. Motorists should watch for equipment entering the highway.

 

HAYWOOD COUNTY
US 70 (US 79, SR1) from near Big Muddy Creek Canal to SR19
Resurfacing on SR1 (US70), from Big Muddy Creek Canal to SR19, will cause temporary lane
closures. Motorists should watch for equipment entering the highway.

 

HAYWOOD COUNTY
SR76 from North Washington Avenue to Alsey Williams Road

Resurfacing on SR76 (US79), from North Washington Ave. to Alsey Williams Rd., will cause
temporary lane closures. Motorists should watch for equipment entering the highway.

 

HAYWOOD COUNTY
I-40 east and westbound from MM46 to MM63
Continuing through Friday, August 7, 7 p.m.-6 a.m. —  There will be intermittent lane
closures on I-40 in Haywood County both east and westbound from MM46 to MM63 to repair
short sections of damaged asphalt.

 

HAYWOOD COUNTY (CSX Railroad)
SR222 at CSX Railroad Crossing in Stanton, TN
Monday, August 10 through Friday, August 14 —  SR222 will be closed at the railroad
crossing in Stanton, TN (LM 4.56) for CSX to replace railroad ties.

 

HENDERSON COUNTY
I-40 (Exit 101) at the SR104 Interchange —
Continuing through Wednesday, August 12, 7 p.m.-6 a.m. — There will be nightly
lane closures on I-40 east and west bound between MM100-102, including possible ramp
closures at Exit 101 for ramp improvements, including grading, drainage, lighting, and paving.

 

LOOK AHEAD
Wednesday, August 12 through Wednesday, August 19, 7 p.m.-6 a.m. — There will be
nightly lane closures on I-40 east and west bound between MM100-102, including possible ramp
closures at Exit 101 for ramp improvements, including grading, drainage, lighting, and paving.

 

MCNAIRY COUNTYSR 142 From US45 (SR5) to near Albert Robinson Road
The resurfacing will cause temporary lane closures. Motorists should watch for equipment
entering the highway.

 

MCNAIRY AND CHESTER COUNTY
SR 224 from US64 to SR22A in Chester County
The resurfacing with cold in-place recycling (thin mix overlay) on SR224 from US 64 (SR15) in
McNairy County to SR22A in Chester County, including bridge repair work will cause daily lane
closures.

 

MCNAIRY COUNTY
SR 5 (US 45) from SR57 to US64
The resurfacing with cold in-place recycling on US45 (SR5) from SR57 to US 64 (SR15),
including concrete repair on the bridge over Roland Creek will cause daily lane closures.

 

District 49
SHELBY, FAYETTE, TIPTON, LAUDERDALE COUNTY

 

INTERSTATE
SHELBY COUNTY
I-40 Eastbound from Levee Rd. to Hollywood Street (L.M. 4.65 to L.M. 7.50).
There will be long-term lane closures on East and Westbound I-40 inside lanes for rubblization
and paving operations. At least two lanes in the east and westbound directions will remain open at all times.

 

Nightly Monday, August 10, 9 p.m. to Friday, August 14, 6 a.m. —
There will be lane closures for pothole patching operations.  One lane will remain open in each
direction at all times. WEATHER PERMITTING.

Watkins to I-40 Westbound Ramp Closure
Monday, August 10, 9 p.m. to Monday, August 17, 6 a.m. —
There will be a ramp closure to perform paving operations. A detour will be in place.

 

SHELBY COUNTY
I-40 from near Sycamore View Road (L.M. 16.13) to Fletcher Creek (L.M. 19.44)

Nightly, 8 p.m. to 6 a.m. —
There will be intermittent nightly lane closures on East and Westbound I-40 for paving
operations. One lane will remain open in both directions at all times.

 

SHELBY COUNTY
I-40 Hernando DeSoto Bridge over the Mississippi River
Friday, August 7, 9 a.m.-11 a.m. — There will be temporary lane closures along I-40
Westbound on the Hernando de Soto Bridge for ITS camera repair activities. At least one lane
will remain open at all times.

 

SHELBY COUNTY
I-40 Eastbound Bridge over Chester Street (L.M. 29.6 to L.M. 30.0) —
Friday, August 14 at 8 p.m. through Monday, August 17 at 6 a.m. —
The inside lane of eastbound I-40 will be closed from MM 26.0 to MM 26.4 to perform bridge
repairs. There will be a 12’ lane width restriction through the work zone during this time.
Weather Permitting.

 

Chester Street at I-40 —
North and Southbound Chester Street will be closed from Larry
Anderson Lane to Scarlet Ridge Drive to perform bridge repairs on the I-40 bridges at L.M. 29.8.
Chester street will remain closed for the duration of the project.

 

SHELBY COUNTY
SR- 14/ US-61 (Third Street) Bridges over ICRR and Nonconnah Creek (L.M. 7.13) Shelby
County, Tennessee. Interstate 55 Exit Ramp Bridge to State Route 14 (L.M. 7.44) State
Route 14 (South 3rd Street) Bridge over Interstate 55 (L.M. 7.46).
The following ramps on US-61 S Third St (SR14) at I 55 will continue to remain closed with
detours in place—
·       Northbound S.R. 14 to northbound I-55.
·       Southbound S.R. 14 to southbound I-55.
·       Southbound I-55 to southbound SR-14
·       Northbound I-55 to northbound/southbound SR-14

Northbound SR-14 traffic was reduced to one lane
from the approach to the bridge over Nonconnah Creek to just beyond the northbound SR-14 to
northbound I-55 loop ramp. Drivers can expect intermittent flagging on SR14.

 

Continuing through August 7, 8 p.m. to 6 a.m. — There will be a Southbound SR-14
directional closure and flagging of Northbound SR-14 lanes.
Monday, August 10 to Friday, August 28, 8 p.m. to 6 a.m. — There will be intermittent lane
closures on northbound and southbound I-55 and northbound and southbound SR-14.

 

SHELBY COUNTY

I-55 from near Mill Branch to I-240 —
Nightly, 8 p.m. to 6 a.m. — There will be intermittent lane closures for bridge repair and paving
operations. One lane to remain open in both directions at all times.

 

SHELBY COUNTY
I-240 from I-40 to I-55 —
Nightly, 8 p.m. to 6 a.m. — There will be intermittent lane closures for resurfacing operations.
One lane to remain open in both directions at all times.

 

SHELBY COUNTY
I-240 from near Elvis Presley Blvd to near S Perkins Road
Nightly, 8 p.m. to 6 a.m. — There will be intermittent lane closures for resurfacing operations.
One lane to remain open in both directions at all times.

 

I-240 East from SR-4 (Lamar Ave.) and Getwell Road
Friday, August 28, 8 p.m. through Monday, August 31, 6 a.m. — There will be temporary
lane closures along I-240 East for bridge repair activities on the Black Bayou Bridge. At least
one lane will remain open at all times. Exit 20A-B (Getwell Road) from I-240 East will be
temporarily closed. August 14 through the 16 will serve as backup dates. WEATHER
PERMITTING

 

SHELBY COUNTY
I-240 from near S. Perkins to near Park Avenue
Nightly, 8 p.m. to 6 a.m. — There will be intermittent lane closures for resurfacing operations.
One lane will remain open in both directions at all times.

Friday, August 7, 8 p.m. to Monday, August 10, 6 a.m.—
Ramp (EXIT 16) from I-240 Eastbound to SR385 Eastbound will be Closed
There will be lane closures for concrete pavement repair operations. Detour will be provided for
SR 385 Exit 16. WEATHER PERMITTING

 

FAYETTE COUNTY
I-269 (SR-385) from near SR-86 (U.S. 72) to SR-57—
Daily — Northbound and Southbound I-269 (SR-385) will be reduced to one lane from SR-86
(U.S. 72) to SR-57 for bridge maintenance activities. At least one lane will remain open at all
times.  The speed limit will be reduced from 65 mph to 55 mph through the work zone. There
will be a 12’ lane width restriction over the I-269 North (SR-385 East) bridge at L.M. 1.23.

 

STATE ROUTES
FAYETTE COUNTY
SR-15 (U.S. 64) from near Tomlin Road to near Woodbridge Road –

Daily — There will be temporary lane closures on east and westbound SR-15 from near Tomlin
Road to near Woodbridge Road to perform resurfacing work. At least one lane in each direction
will remain open at all times.

 

SHELBY COUNTY
SR-1 (N. Parkway) from near Danny Thomas St. to Tillman Street —
Nightly from 8 p.m. to 6 a.m. — There will be intermittent temporary lane closures for Milling
and Paving.  At least one lane in each direction to remain open at all times.

 

SHELBY COUNTY
SR-1 (U.S. 70, Summer Ave.) from near I-40 to North of Sycamore View Road –
Daily — There will be temporary lane closures along Westbound and Eastbound SR-1 for
roadway widening activities. Eastbound SR-1 will be reduced from two lanes to one lane
beginning at the I-40 Frontage Rd. and ending East of Sycamore View Rd. Westbound SR-1 will
be reduced from two lanes to one lane beginning near Munson Rd. and ending at the I-40
Frontage Road. Trucks will be entering and exiting the work zone along SR-1. Flaggers will be
present for directing traffic as necessary. At least one lane in each direction will remain open at
all times.

Access to Summer Trees Drive along SR-1 (Summer Avenue) will be temporarily closed with detours in place.

 

SHELBY COUNTY
SR-3 (US51 Thomas Street) from Near Wolf River and Levee Road to Stage Road
Daily — There will be a long-term lane closure, Northbound and Southbound traffic will be
reduced to 1 lane in each direction with a traffic shift in place to begin bridge replacement.  At
least one lane in each direction to remain open at all times.

 

SHELBY COUNTY
SR-4 from South of Shelby Drive to the Raines/Perkins Road interchange: The following
routes will be affected due to roadway widening activities along SR-4
Affected Routes—
·       Lamar Avenue (SR-4) — Speed limit reduced from 55 mph to 45 mph from South of
Shelby Drive to the Raines/Perkins Road interchange.
·       Shelby Drive (SR-175) — Speed limit reduced from 45 mph to 35 mph at the intersection
with Lamar Avenue (SR-4).
·       Pleasant Run Road — Closed to thru traffic from Pleasant Hill Road. Pleasant Run Road
is closed from Lamar Avenue (SR-4).
Continuing through Friday, August 7, 8 p.m.- 5 a.m. —
There will be intermittent temporary road closures along SR-4 (Lamar Avenue) between Shelby
Drive and E. Raines Road and along SR-175 (Shelby Drive) between Pleasant Hill Road and SR-

4 (Lamar Avenue) for the installation of overhead utility lines. Each road closure will last
approximately 5 minutes, allowing traffic to clear between each crossing installation.

 

SHELBY COUNTY
SR-14 from Kerrville Rosemark Road to the Tipton County line —
The widening on SR-14 (Austin Peay Hwy) from Kerrville-Rosemark to the Tipton County line
will cause shoulder closures and temporary lane closures in both directions. There will be
intermittent lane closures daily on eastbound and westbound SR 14 to perform grading, drainage,
and paving work. Tracy Rd., Idaville Rd., Mulberry Rd., and Gragg Rd. will be closed, and a
detour put in place.

 

SHELBY COUNTY
A.W. Willis/SR-14 from North Front St. (City of Memphis Municipal) to North 3rd  St. (SR
14) (L.M. 11.91). There will be intermittent lane closures on East and Westbound A.W. Willis for Surveying.

 

SHELBY COUNTY
SR-57 (E. Poplar Avenue) from Fletcher Road to I-269 (SR-385)—

Daily — There will be intermittent temporary lane closures along East and Westbound SR-57 for
roadway widening activities. Flaggers will be present for directing traffic. At least one lane will
remain open at all times.

 

SHELBY COUNTY
SR-57 (East Parkway) from North Parkway (L.M. 0.49) to Eastwood Ave (L.M. 0.903) There will be intermittent lane closures on North and Southbound East Parkway for Surveying.

 

TIPTON COUNTY
SR-3 from North Myron Creek (L.M. 7.00) to South of Old Hwy 51 (L.M. 8.00)—
Beginning August 11, 2026 — The southbound outside and northbound inside lanes will be
closed to begin turn lane construction for the Tipton County landfill.

 

TIPTON COUNTY
SR-179 from SR-54 to SR-14 — There will be temporary lane closures on east and westbound
SR 179 from SR 54 to SR 14 DAILY to perform resurfacing work.

Share On

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
Monday-Friday
Saturday-Sunday

Deal Of the Day

Thursday

ThursdayGet Deal

Crypto Brought To You By Mann's Wrecker

    Bitcoin