From the Tennessee Department of Transportation –
Madison County – I-40 – The grading, drainage, construction of bridges, retaining walls and noise walls, ITS and paving on I 40 from west of US 412 (SR 20, Hollywood Drive) to west of the US 45 Bypass (SR 186).
NIGHTLY, 7 p.m.-6 a.m. – I-40 east and westbound will have intermittent lane closures from east of MM 76.0 (Exit 76) to east of MM 80.0 for permanent signs and deck sealing/joints.
Sunday, December 3 through Tuesday, December 5, 7 p.m.-6 a.m. – I-40 east and westbound will have intermittent lane closures and rolling roadblocks from east of MM 76.0 (Exit 76) to east of MM 80 for permanent overhead signs.
Restrictions – Speed limit is reduced to 65 MPH on I-40 eastbound from MM 75.2 to MM 76.9 and 55 MPH from MM 76.9 to MM 79.9. Speed limit is reduced to 55 MPH I-40 westbound from MM 82.3 to MM 78.4.
LOOK AHEAD:
Wednesday, December 6 through Wednesday, December 13, 7 p.m.-6 a.m. – I-40 east and westbound will have intermittent lane closures and rolling roadblocks from east of MM 76.0 (Exit 76) to east of MM 80 for permanent overhead signs.
Madison County US-70 (SR-1) – The resurfacing on US 70 (SR 1) from near Mobile Street to Whitehall Street will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.
Madison County US-412 (SR-20) – The resurfacing on US 412 (SR 20) (North Parkway) from near I-40 to US 70 (SR 1), including bridge expansion joint repair and thin epoxy overlay will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for crews and equipment in the roadways.