From the Tennessee Department of Transportation
Tennessee Department of Transportation will halt all lane closure activity on interstates and state routes for the Memorial Day holiday from 12 noon on Friday, May 23, to 6 AM on Tuesday, May 27
There will be possible DAYTIME or NIGHTTIME lane closures at various locations in Region 4 to make repairs or new installs on an as needed basis at various locations throughout the 21 counties.
District 47
DISTRICT 47 CRACK SEALING
Various locations on various routes in CARROLL, DYER, HENRY, and OBION COUNTIES
SR3 There will be intermittent lane closures on SR 3, in Dyer County, beginning at LM 24.23 to LM 24.68 and in Obion County, beginning at LM 0.00 and ending at LM 15.35.
BENTON COUNTY
I-40 at Exit 126 The grading, drainage, and paving on I-40 at the US-641 (SR-69) interchange (Exit 126) will cause temporary lane closures throughout the project.
BENTON COUNTY
SR-69 The Resurfacing on SR69 from the Decatur County line to James Walker Road will cause temporary lane closures throughout the project.
CARROLL COUNTY
SR-76 (US-79)Â The grading, drainage, noise walls, signals and paving on U.S. 79 (S.R. 76) from near S.R. 77 to near Cutlip Lane will cause lane closures throughout the project.
CARROLL COUNTY
SR-22 The intersection improvements on SR 22 and Clyde Road at the Huntingdon Industrial Park entrance will cause lane closures throughout the project.
SR-22 The intersection improvements on SR 22 and Lexington Street at the Huntingdon Industrial Park entrance serving Dynamix Casting Fluxes will cause lane closures throughout the project.
CARROLL COUNTY
SR-1 The Resurfacing on SR1 (US 70) from near Rutherford Fork Obion River to SR22 includes all directions of Huntingdon Square) will cause temporary nightly and daily lane closures throughout the project for milling and paving.
GIBSON/CARROLL COUNTY
SR-76 (US-79) The grading, drainage, construction of a concrete box bridge, noise wall and paving on US 79 (SR 76) from west of Cades-Atwood Road in Gibson County to east of SR 77 in Carroll County will cause temporary lane closures throughout the project.
SR-76(US-79)/SR77 – The new four-lane section is open and final work on the project will continue under traffic with intermittent lane closures. TDOT advises all motorists to exercise caution as they adjust to new traffic patterns.
GIBSON COUNTY
SR-420 The Resurfacing on SR420 from US 45W (SR 5) to SR 186 will cause temporary lane closures throughout the project.
HENRY COUNTY
SR-218 The Resurfacing on SR218 from SR77 to SR76 will cause temporary lane closures throughout the project.
OBION COUNTY
SR22 The Resurfacing on SR22 from SR5 to SR21 including bridge joint expansion joint repair will cause temporary lane closures throughout the project.
OBION COUNTY
SR22 A pipe replacement on SR-22 will require a lane closure at MM 17.28 close to Kirk Road on May 21.
OBION COUNTY
U.S. 51(SR3) The construction of turn lanes on U.S. 51 (S.R. 3) at Greenfield Drive/N. Morgan Street for State Industrial Access (SIA) support serving Williams Sausage HQ will cause an inside lane closure on U.S. 51(SR3) to thru traffic during construction. The cross-over at Greenfield Drive and N. Morgan Street will also be closed to thru traffic during construction. The Speed Limit is reduced from 50 mph to 40 mph on U.S. 51.
OBION COUNTY
U.S. 51(SR3), U.S. 45 (SR 5) Soil boring work will cause temporary lane closures on U.S 51 and U.S. 45 in South Fulton. This work will take place in the interchange of U.S. 51 and U.S. 45 and areas immediately adjacent to the interchange along these routes.
District 48
CHESTER COUNTY
SR100 between E. Main Street and Baker Road
Crews are replacing 2 bridges on SR100 between East Main Street and Baker Road. Please use caution throughout the area.
HARDEMAN COUNTY
US64 (SR15) from Walton Road to Davis Way There will be lane closures daily for expansion joint repairs and thin epoxy overlay on the bridge decks. Resurfacing work will soon follow.
HARDIN COUNTY
SR128 from US64 (SR15) to near Clifton Road – There will be lane closures daily for resurfacing work.
HAYWOOD COUNTY
SR180 Near Jeffries Road to Raymond Akin Road – Closed to through traffic
SR180 is closed to through traffic for crews to repair the bridge over Lost Creek just north of Nutbush, TN due to damage caused by the recent multi-day flood event.
HAYWOOD COUNTY
SR222 from near proposed SR468 to near Camp Ground Road
The reconstruction and widening of SR222 from near proposed SR468 to near Camp Ground Road will cause traffic disruption daily. Please use caution through the area.
HENDERSON COUNTY
I-40 from S.R. 104 (Exit 101) to S.R. 22 (Exit 108) The resurfacing on I-40 from near S.R. 104 to west of S.R. 22.
LOOK AHEAD
Sunday, June 1 through Wednesday, June 4, 7PM-6AM – There will be intermittent lane closures on I-40 east and westbound in Henderson County from MM101-MM108 for milling and paving operations.
MADISON COUNTY
I-40 from Lower Brownsville Road to South Fork Forked Deer River
Tuesday, May 27 through Wednesday, June 4, 7PM-6AM – There will be intermittent lane closures on I-40 east and westbound in Madison County from MM74-MM78 for milling and paving operations.
Restrictions – Speed limit is reduced from 70 MPH to 60 MPH on I-40.
MADISON COUNTY
I-40 AT S.R. 138 (EXIT 68) The interchange improvements on I-40 at S.R. 138 (Exit 68), including grading, drainage, and paving, will cause temporary lane closures in both directions.
One lane will remain open at all times.
Restrictions – The speed limit is reduced from 70 MPH to 60 MPH on I-40.
Continuing through Wednesday, May 28, 7PM-6AM – There are no scheduled closures.
District 49
FAYETTE COUNTY
SR-222, including the I-40 interchange (Exit 42) Grading, drainage, signals, and paving on SR 222 from Hebron Drive to near Thorpe Drive, including the I-40 interchange (Exit 42), will cause temporary lane closures in both directions. One lane will remain open at all times.
Restrictions – The speed limit is reduced from 45 MPH to 40 MPH on SR 222.
Continuing through Wednesday, May 28, 8PM-4:30AM – There are no scheduled closures.
FAYETTE COUNTY
SR-196 from Poplar Acres Road to SR-193 There will be temporary lane closures on north and southbound SR 196 from Poplar Acres Road to SR 193Â DAILYÂ to perform crack sealing work.
FAYETTE COUNTY
SR-76 from Liberty Road to SR-193 – There will be temporary lane closures on north and southbound SR 76 from Liberty Road to SR 193Â DAILYÂ to perform crack sealing work.
LAUDERDALE COUNTY
SR-88 from James C Moore Road to US-51 (SR-3) There will be temporary lane closures on east and westbound SR 88 from James C Moore Road to US 51 (SR 3)Â DAILYÂ to perform crack sealing work.
SHELBY COUNTY
I-240 On/Off Ramps intersecting with Lamar Avenue and Madison Avenue
Continuing through Wednesday, May 28, 7 p.m.-6 a.m. – There will be temporary lane and ramp closures for concrete work of ADA ramps. At least one lane to remain open at all times and detours for ramp closures provided as necessary. Excluding Friday, May 23, at Noon until Tuesday, May 27, at 6 a.m. for Memorial Day.
SHELBY COUNTY
I-240 from near SR-57 (Poplar Avenue) to near US-64 (US-70, SR-1 Summer Avenue)
Continuing through Wednesday, May 28, 7 p.m.-6 a.m. – There will be intermittent temporary lane closures for asphalt resurfacing activities. At least one lane in each direction to remain open at all times. Excluding Friday, May 23 at Noon until Tuesday, May 27, at 6 a.m., for Memorial Day.
SHELBY COUNTY
SR-57 (E. Poplar Avenue) from Fletcher Road to I-269 (SR-385) Continuing Wednesday, May 21 to Wednesday, May 28- There will be intermittent temporary lane closures along Eastbound and Westbound SR-57 for roadway widening activities. Flaggers will be present for directing traffic. At least one lane will remain open at all times. Excluding Friday, May 23 at Noon until Tuesday, May 27 at 6 a.m., for Memorial Day.
SHELBY COUNTY
SR-4 from South of Shelby Drive to the Raines/Perkins Road interchange – The following routes will be affected due to roadway widening activities along SR-4.
Affected Routes:
·         Lamar Avenue (SR-4): Speed limit reduced from 55 mph to 45 mph from South of Shelby Drive to the Raines/Perkins Road interchange.
·         Shelby Drive (SR-175): Speed limit reduced from 45 mph to 35 mph at the intersection with Lamar Avenue (SR-4).
·         Pleasant Run Road: Closed to thru traffic from Pleasant Hill Road. Pleasant Run Road is closed from Lamar Avenue (SR-4).
Â
SHELBY COUNTY
SR-14 from Kerrville Rosemark Road to the Tipton County line
The widening on SR-14 (Austin Peay Highway) from Kerrville-Rosemark to the Tipton County line will cause shoulder closures and temporary lane closures in both directions. There will be intermittent lane closures daily on eastbound and westbound SR 14 to perform grading, drainage, and paving work. Tracy Road, Mulberry Road, and Gragg Road will be closed, and a detour put in place.
SHELBY COUNTY
SR-23 (Walnut Grove Road) from SR-57 (Poplar Avenue) To I-240
Nightly 7 p.m. –Â 6 a.m. – There will be nighttime lane closures along east and westbound Walnut Grove Rd. (SR-23) from Poplar Ave. (SR-57) to I-240 for pavement marking activities. One lane will remain open in both directions at all times.
Daily 9 a.m.- 3 p.m. – There will be daytime lane closures along east and westbound Walnut Grove Road (SR-23) from Poplar Avenue (SR-57) to I-240 for pavement marking activities. One lane will remain open in both directions at all times.
Excluding Friday, May 23 at Noon until Tuesday, May 27 at 6 a.m., for Memorial Day.
Â
SHELBY COUNTY
SR1 (US Hwy 70) From Lamb Road to Milton Wilson Road
Daily 7 a.m.- 7 p.m. – There will be weekday lane closures along east and westbound Summer Avenue (SR-1) from west of Lamb Road to near the Fayette County Line for resurfacing and bridge repair activities. One lane will remain open in both directions at all times.
SHELBY COUNTY
SR385 From Ridgeway Exit to Houston Levee Exit
Sunday, May 25 through Thursday, May 29, 8P.M. to 6 A.M. – There will be temporary lane closures on I-240 in both directions for pothole patching. One lane in each direction will remain open at all times.
Shelby County
SR 86(U.S.72) Southbound from Shelby Drive to I-269
Wednesday, May 21 through Thursday May 22 7 A.M. to 3 P.M.
The right lane will be temporarily closed for pothole repairs. One lane will always remain open.
SHELBY COUNTY
SR 1 (U.S. 51) Danny Thomas Boulevard from Poplar Avenue (L.M. 2.85) to Jackson Avenue (L.M. 3.47), Daily 9 a.m. – 3 p.m. – There will be temporary lane closures for ADA ramp construction and Traffic Signal installations. One or more lanes will remain open in both directions on (U.S. 51) Danny Thomas Boulevard at all times.
SHELBY COUNTY
SR-3 from East Brooks Road to South Parkway East – There will be temporary lane closures on north and southbound SR 3 from East Brooks Road to South Parkway East DAILY to perform crack sealing work.
SHELBY COUNTY
SR-175 (Shelby Drive) from Quality Drive to Tuggle Road
Continuing through Friday, May 23, 7 p.m.-6 a.m. There will be intermittent temporary lane closures along Westbound SR-175 for roadway widening activities. At least one lane in each direction will remain open at all times.
TIPTON COUNTY
US-51 (SR-3) from East Woodlawn Avenue to Winn Street – There will be temporary inside and outside lane closures on north and southbound US 51 from East Woodlawn Avenue to Winn Street DAILY to perform bridge repairs and resurfacing work. At least one lane in each direction will be open at all times.
TIPTON COUNTY
SR-3 from Holly Grove Road to Lanny Bridges Avenue
Continuing through Wednesday, May 28 – There will be DAILY temporary lane closures for replacement of Curb Ramps. One lane to remain open at all times. Excluding Friday, May 23 at Noon until Tuesday, May 27 at 6 a.m., for Memorial Day.
TIPTON COUNTY
SR-3 from Winn Avenue to Hope Street – There will be temporary lane closures on north and southbound SR 3 from Winn Avenue to Hope Street DAILY to perform crack sealing work.
TIPTON COUNTY
SR-54 from S Maple Street to Industrial Road – There will be DAILY temporary lane closures for replacement of Curb Ramps. One lane to remain open at all times. Excluding Friday, May 23 at Noon until Tuesday, May 27 at 6 a.m., for Memorial Day.
2 thoughts on “Road work schedule for West Tennessee counties”
You need to check state route 190, so many holes why is it not on the list?
State route 190 needs to be on the list.